Name and explain with a suitable example the technique of Scientific Management given by Taylor, with the objective of determining the number of workers to be employed for a task.


Share with your friends
Call

Time Study- It determines the standard time taken to perform a well-defined job. The standard time is fixed for the whole of the task by taking several readings. The method of time study will depend upon volume and frequency of task, the cycle time of operation and time measurement costs.
For example- On the basis of several observations it is determined that standard time taken by the worker to make one cardboard box is 20 minutes. So in one hour she/he will make 3 boxes. Assuming that a worker has to put in 8 hours of work in a shift and deducting one hour for rest and lunch, it is determined that in 7 hours a worker makes 21 boxes 3 boxes per hour. Now this is the standard task a worker has to do. Wages can be decided accordingly.

Talk Doctor Online in Bissoy App