A project where many uses of the impounded water are integrated with one another is known as a multipurpose project. It is built for irrigation, power generation, water supply, flood control. Recreation, Etc.
Causes for pollution of water of river Ganga:
(i) Duniping of untreated sewage
(ii) Industrial Wastes
Effects:
(a) Growth of disease-causing microorganisms in the river water.
(b) The river water becomes more acidic which makes...
Following are the challenges faced by Jute industries in India :
(i) Prices of jute textiles are so low that industrialists hesitate to set up these industries.
(ii) The international demand for...
If the average depth of rivers is h meter, then the flow volume of water in the river Alaknanda =20*h*12000/3600 m³/s
=66.67h m³/s
The flow volume of water in the river Bhagirathi...
The Reclamation in Bombay wa6 necessary because:
(i) When the islands of Bombay passed into British hands, the East India Company shifted its base From Surat to Bombay.
Thus, Bombay became a...
(a) Damodar Valley Corporation's is first multipurpose river valley project of independent India was in the year 1954. The joint venture projects are Maithon Power Limited, Panchat and Tilayiya are...
Advantages:
(i) These are the main source of power generation.
(ii) They provide us neat, pollution free and cheapest energy which is the backbone of industry and agriculture.
(iii) These projects control...
(i) Problems faced by jute mills:
(a) Stiff competition in international market like Bangladesh, Brazil, Philippines, Egypt, etc.
(b) Stiff competition from synthetic fibre.
(c) Products need to be diversified.
(ii) In 2005,...