A can complete a task alone in 8 days, while B takes 12 days to do it by herself. Together with C it takes them 4 days to complete the work. If C and D together can complete the task in 15 days, then how many days will D need to complete the task by herself?
A
36
B
32
C
40
D
30
Correct Answer:
40
Three friends Anne, Bob and Chris work together to do a certain job. Time it takes them to do the work together to do a certain job. The it takes them to do the work together is 6 hours less than Anne would have take alone, 1 hour less than Bob would have taken alone and half the time Chris would have taken working alone text. How long did it take them to complete the job, working together ?
A
20 minutes
B
30 minutes
C
40 minutes
D
50 minutes
A and B together can do a piece of work in 10 days. If A can do the work in 15 days, find in how many days that B alone can do the same work. Given below are the steps involved in solving the above problem. Arrange them in sequential order. A) One day's work of B is 1/10 - 1/15 B) One day's work of A and B is 1/10 and One day's work of A is 1/15 C) B alone can do the work in 30 days D) One day's work of B is 1/30
A
BADC
B
ADCB
C
BCAD
D
BDAC
A and B together can complete a task in 12 days. However, if A works alone, completes half the job and leaves and then B works alone and competes the rest of the work, it takes 25 days in all to complete the work. If B is more efficient than A, how many days would it have taken B to do the work by herself?
A
18
B
22
C
20
D
15
X and Y together can do a piece of work in 30 days. Y and Z together can do the work in 20 days. X starts the work and works for 15 days then Y takes that work and works for 27 days. Finally Z finishes the remaining work in 9 days. In how many days Y alone can complete the entire work?
A
60
B
45
C
50
D
65
If Arif works alone he will take 20 more hours to complete a task than if he works with Babu to complete the task. If Babu work alone, he will take 5 more hours to complete the task than if he works with Arif to complete the task. What is the ratio of the time taken by Arif to than taken by Babu if each of them works alone to complete the task?
A
2 : 1
B
5 : 3
C
7 : 5
D
None of these
Two men and women are entrusted with a task. The second man needs three hours more to cope up with the job than the second man and the woman would need working together. The first man, working alone, would need as much time as second man and the woman working together. The first man working alone, would spend eight hours less than the double period of the time second man would spend working alone. How much time would the two men and the women need to complete the task if they all asked together?
A
1 hour
B
2 hours
C
3 hours
D
4 hours
E
5 hours
Working together, Asha and Sudha can complete an assigned task in 20 days. However, if Asha worked alone and completed half the work and then Sudha takes over the task and completes the second half of the task, the task will be completed in 45 days. How long will Asha take to complete the if she worked alone ? Assume that Sudha is more efficient than Asha.
A
25 days
B
30 days
C
60 days
D
65 days
Sharan and Mayukh, working together, can complete a task in 18 days. However, Mayukh works alone and leaves after completing 1/3 of the task. Then, Sharan takes over and completees the remaining work by himself. As a result, the duo could complete the task in 40 days. How many days would Sharan alone have taken to do the job if Mayuk' had worked faster than Sharan ?
A
24
B
45
C
72
D
30
A alone can complete a piece of work in 18 days and B alone in 15 days, B alone worked at it for 10 days and then left the work. In how many more days, will A alone complete the remaining work ?
A
5 days
B
$${\text{5}}\frac{1}{2}{\text{ days}}$$
C
6 days
D
8 days
A, B and C can complete a task together in 10 days. A and B would need 12 days if only the two of them worked, while B and C would take 20 days if only the two of them worked. If B worked alone, how many days would she take to complete the task?
A
30
B
22
C
45
D
20