Bissoy
Login
Get Advice on Live Video Call
Earn $ Cash $ with
consultations on Bissoy App
The length of a runway under standard atmospheric conditions is 1800 m. If the actual reduced level of the site is 1200 m, the design length of the runway is
A
2360 m
B
2460 m
C
2560 m
D
2660 m
Correct Answer:
2560 m
Consider the following statements regarding ICAO recommendation for correction to basic runway length of these statements
1. The basic runway length should be increased at the rate of 7 percent per 300 m rise in elevation above the mean sea level.
2. The basic runway length after having been corrected for elevation should be further increased at the rate of 1 percent for every 1°C rise in airport reference temperature above the standard atmospheric temperature at that elevation.
3. The runway length after having been corrected for elevation and temperature should be further increased at the rate of 20% for every 1 percent of effective gradient.
A
1 and 2 are correct
B
2 and 3 are correct
C
1 and 3 are correct
D
1, 2 and 3 are correct
A university library budget committee must reduce exactly five of eight areas of expenditure—I, J, K, L, M, N, O and P—in accordance with the following conditions: If both I and O are reduced, P is also reduced.
If L is reduced, neither N nor O is reduced.
If M is reduced, J is not reduced.
Of the three areas J, K, and N exactly two are reduced. Question : If both K and N are reduced, which one of the following is a pair of areas neither of which could be reduced?
A
I, L
B
J, L
C
J, M
D
I, J
The length of runway under standard conditions is 2000 m. The elevation of airport site is 300 m. Its reference temperature is 33.05°C. If the runway is to be constructed with an effective gradient of 0.25 percent, the corrected runway length will be
A
2500 m
B
2600 m
C
2700 m
D
2800 m
The reduced level of the proposed site of an air port is 2500 m above M.S.L. If the recommended length by I.C.A.O. for the runway at sea level is 2500 m, the required length of the runway is
A
2500 m
B
3725 m
C
3000 m
D
3250 m
The runway length after correcting for elevation and temperature is 2845 m. If the effective gradient on runway is 0.5 percent then the revised runway length will be
A
2845 m
B
2910 m
C
3030 m
D
3130 m
Which set of the following events occurs during the elongation step of translation?
P. Attachment of mRNA with the smaller subunit of ribosome
Q. Loading of correct aminoacyl-tRNA into the A site.
R. Formation of a peptide bond between the amino acyl-tRNA in the A site and the peptide chain that is attached to the peptidyl-tRNA in the P site.
S. Dissociation of the ribosomal subunits.
T. Translocation of peptidyl-tRNA from the A site to the P site of the ribosome.
A
P, Q and R
B
P, Q and T
C
Q, R and T
D
R, S and T
Under conditions of equal reduced pressure and equal reduced temperature, substances are said to be in the 'corresponding states'. At equal reduced conditions i.e., at the corresponding state, the __________ of different gases are nearly the same.
A
Compressibility
B
Molecular weight
C
Humidity
D
None of these
Consider the following statements.
1. SI unit of atmospheric pressure is Nm
-2
or pascal and CGS unit is dyne/cm
2
.
2. The barometer is a device by which the atmospheric pressure is measured.
3. The standard atmospheric pressure is the pressure required of 76 cm of Hg column or 760 mm of Hg column, which is equivalent to 1 atm.
Which of the statements given above is/are correct?
A
1 and 2
B
Only 1
C
2 and 3
D
1, 2 and 3
You are the administrator of a Windows 2000 Server computer named Intra. Intra is a member of an Active Directory domain and hosts an Intranet Web-Ske for your company. Company policy requires that only authenticated users have access to the intranet site. All company users have a user account in the Active Directory domain. You configure directory security for the Web Site to use integrated security. However, you discover that users can access the Web Site without authentication. You need to ensure that only authenticated users can access the web site. What should you do?
A
Install Active Directory on the server
B
Select Basic Authentication check box
C
Clear the Allow Anonymous Connection check box
D
Disable the IUSE_inta user account on Intra
E
Clear the Allow IIS to Control Password check box
Pavan and Sravan are two persons. If Pavan works with his actual efficiency and Sravan twice of his actual efficiency then it takes 25 days to complete the work. But If Pavan works twice of his actual efficiency and Sravan with his normal efficiency then the work is completed in 20 days. How many days would it take if Sravan alone works with his actual efficiency (in Days)?
A
50
B
100
C
70
D
35