The question below consists of a set of labelled sentences. These sentences, when properly sequenced form a coherent paragraph. Select the mostlogical order of sentences from among the options. P: About 30 new hydro projects are now under execution with an installed capacity of 5,600 MW.<br />Q: However, with the rapid increase in demand for power, higher priority was given to the pithead super thermal power stations as their gestation period wassmaller than that of the hydel schemes.<br />R: Many projects were taken up for execution after independence and at one time (1962-63), the capacity contribution from hydro schemes was equal to thermal schemes.<br />S: The first hydro generating unit in India was commissioned in Darjeeling (W.Bengal) in 1897.

Correct Answer: SRQP